The research preview

A clearer starting point.

Explore the evidence behind a launch decision or a potential opportunity. Start here, then follow the questions that matter.

20 published references to explore

Planning context · capacity and quotes require confirmation
01 / Rocket 4.0In development

Astra

Responsive-launch development with revised lifecycle targets

Published figures need clarification. No payload-capacity match is asserted.

  • The current homepage gives a one-tonne mid-inclination LEO lifecycle target.
  • Older Rocket 4 publications give different figures; these are not mixed into a current orbit-specific capacity match.

A current mission-specific quote and availability confirmation are required.

What still needs confirmation
  • Current qualification and flight outcome for this specific vehicle
  • Confirmed mission, interfaces, schedule and customer acceptance
Provider source ↗ · Reviewed Oct 21, 2026
02 / Kinetica-1 rideshareOrbital flight reported

CAS Space

Published rideshare services and a small-launch vehicle reference

Mass falls within the published reference envelope; precise mission fit needs confirmation.

  • The provider publishes 2,000 kg to LEO and 1,500 kg to 500 km SSO for Kinetica-1.
  • The rideshare page describes scheduling, licensing and payload-integration services.

Provider quotation and programme readiness confirmation required.

What still needs confirmation
  • Current flight readiness and a firm service date
  • Mission-specific payload performance and integration
  • Launch-site eligibility, export requirements and contracting terms
Provider source ↗ · Reviewed Oct 20, 2026
03 / Ceres-1Orbital flight reported

Galactic Energy

A specialist solid-propellant launch family with reported orbital missions

Orbit is advertised; payload performance needs confirmation.

  • The provider identifies Ceres as its light solid-launch family.
  • Its mission report describes two satellites deployed into a 500 km dawn-dusk orbit in December 2023.

Provider quotation and programme readiness confirmation required.

What still needs confirmation
  • Current flight readiness and a firm service date
  • Mission-specific payload performance and integration
  • Launch-site eligibility, export requirements and contracting terms
Provider source ↗ · Reviewed Oct 20, 2026
04 / HANBIT-NanoFlight programme

INNOSPACE

Very small payloads and a hybrid-propulsion flight programme

Published programme target; flight readiness and service availability need confirmation.

  • Published reference: 90 kg to 500 km SSO from Alcântara.
  • Do not apply that performance to another launch site without confirmation.

Provider quotation and programme readiness confirmation required.

What still needs confirmation
  • Current flight readiness and a firm service date
  • Mission-specific payload performance and integration
  • Launch-site eligibility, export requirements and contracting terms
Provider source ↗ · Reviewed Oct 20, 2026
05 / ZEROIn development

Interstellar Technologies

Japanese orbital-launch development beyond MOMO's suborbital heritage

Published programme target; flight readiness and service availability need confirmation.

  • The ZERO page publishes a 1,000 kg LEO design reference and dedicated/rideshare configurations.
  • MOMO's suborbital flights are separate evidence and do not demonstrate ZERO orbital service.

A current mission-specific quote and availability confirmation are required.

What still needs confirmation
  • Current qualification and flight outcome for this specific vehicle
  • Confirmed mission, interfaces, schedule and customer acceptance
Provider source ↗ · Reviewed Oct 21, 2026
06 / SpectrumOrbital flight reported

Isar Aerospace

European small-launch programme with reported orbital deployment

Mass falls within the published reference envelope; precise mission fit needs confirmation.

  • Published performance targets: 1,000 kg to LEO and 700 kg to SSO.
  • The provider reports orbital payload deployment on its September 2026 qualification mission.

Provider quotation and programme readiness confirmation required.

What still needs confirmation
  • Current flight readiness and a firm service date
  • Mission-specific payload performance and integration
  • Launch-site eligibility, export requirements and contracting terms
Provider source ↗ · Reviewed Oct 20, 2026

Development targets and flight readiness are separate. Inspect the global programme directory →

Want a brief around your mission?

Discuss the research scope and coverage. Proposed pilot price: $99, one time.

Discuss a Mission Brief ↗

Launch schedule context

Schedules are tentative and do not show bookable space.

Checking the launch schedule source…